
12 Sept – Our colleagues at ELRO are in full assembly mode! These weeks the control panels for the azimuth pumps of the Saipem 7000 are being assembled. This assignment was granted by one of the global market leaders in ship propulsion technology.
Previously ELMA supplied a new control system for the tugger winches of the two cranes on the same pipelay crane vessel.